Design discussion (c) Sherryl Manalo

In part 1, I wrote about some healthy habits of successful engineering teams to facilitate team building and work well with each other. This article, which is the second part of the 7-part series, is about having some key points in mind during the design phases to effectively collaborate in this phase as a team. Getting these phases right can make a big difference to the solution, the duration of the project, and can help avoid or reduce several project risks. 

Visit my LinkedIn article to read more.


Woelfchen

Currently, Sherryl Manalo is a Software Engineering Manager at Microsoft in the Industry Solutions Engineering (ISE) Organization. She leads multiple teams which engage with customers to build solutions running in the Microsoft Cloud. She has a Physics background and was in research before founding own start-up early in-career to build Open Source Solutions for customers. In 2008, she joined Microsoft and had various technical roles in the local organization before joining CSE in 2017. In her spare time, she likes going for a walk or riding her e-scooter, reading books, painting, cooking with her husband, hiking and skiing in winter.